‏551.00 ₪

TBM Excavation in Difficult Ground Conditions - Case Studies from Turkey

‏551.00 ₪
ISBN13
9783433031506
יצא לאור ב
Berlin
זמן אספקה
21 ימי עסקים
עמודים
354
פורמט
Hardback
תאריך יציאה לאור
2 בנוב׳ 2016
The book relates experience of TBM drives in difficult geology, making use of case studies from Turkey to demonstrate the influence of the local geotechnical conditions on the selection of a tunnel boring machine and the selection of tools.
The book relates experience of TBM drives in difficult geology, making use of case studies from Turkey to demonstrate the influence of the local geotechnical conditions on the selection of a tunnel boring machine and the selection of tools. There is an extensive description how various geological phenomena, such as for example transition zones, dikes, rock discontinuities, blocky ground, squeezing ground, swelling clays and high strength and abrasive rocks, can reduce the advance rate and what countermeasures can be introduced. There is also a discussion of necessary advance probing and safety measures. Since the presented practical experience from Turkey can also be applicable for other tunnel projects in difficult geology, the book represents a valuable source of knowledge for every tunneler.
מידע נוסף
עמודים 354
פורמט Hardback
ISBN10 3433031509
יצא לאור ב Berlin
תאריך יציאה לאור 2 בנוב׳ 2016
תוכן עניינים Preface VII Acknowledgements IX About the Authors XI 1 Introduction 1 2 Geology of Turkey and Istanbul, expected problems, some cuttability characteristics of the rocks 3 2.1 Introduction 3 2.2 Geology of Turkey 3 2.3 Geology of Istanbul 4 2.4 TBM performance in different projects in Istanbul 6 2.5 Description of geological formations in Istanbul, physical and mechanical properties 8 2.6 Full-scale linear rock cutting tests with disc cutters in rock samples collected from different projects in Istanbul 40 2.7 Conclusions 68 References 70 3 Difficult ground conditions dictating selection of TBM type in Istanbul 73 3.1 Introduction 73 3.2 Case study of open TBM in complex geology (1989), in Baltalimani tunnel: Why open type TBM failed 73 3.3 Double shield TBM in the Istanbul-Moda collector tunnel, 1989/90 80 3.4 Double shield TBM working without precast segment, difficulties in difficult ground: Tuzla-Dragos tunnel in Istanbul 80 3.5 Difficulties in using slurry TBMs in complicated geology, Marmaray tunnel project 84 3.6 Difficulties in single-shield TBM working in open mode in complex geology: An example from Kadikoy-Kartal metro tunnel 86 3.7 Eurasia tunnel excavated by a large diameter slurry TBM 88 3.8 Conclusions 88 References 90 4 Difficult ground conditions affecting performance of EPB-TBMs 91 4.1 Introduction 91 4.2 Factors affecting performance of EPB-TBMs 92 4.3 Performance prediction of EPM TBMs in difficult ground conditions 93 4.4 Conclusions 106 References 107 5 Selection of cutter type for difficult ground conditions 109 5.1 Introduction 109 5.2 Comparative studies of different type of cutters for Tuzla-Dragos tunnel in Istanbul - test procedure and results 109 5.3 The inefficient use of tungsten carbide studded disc cutters in the Marmaray-Istanbul project 114 5.4 Conclusions 115 References 116 6 Effects of North and East Anatolian Faults on TBM performances 117 6.1 Introduction 117 6.2 Kargi tunnel 117 6.3 Gerede tunnel 118 6.4 Dogancay energy tunnel 120 6.5 Nurdagi railway tunnel 122 6.6 Uluabat energy tunnel 123 6.7 Tunnels excavated by drill and blast methods 126 6.8 Conclusions 127 References 128 7 Effect of blocky ground on TBM performance and the mechanism of rock rupture 129 7.1 Introduction 129 7.2 Mechanism of rock rupture and face collapse in front of the TBM in the Kozyatagi-Kadikoy metro tunnels in Istanbul 131 7.3 Conclusions 140 References 141 8 Effects of transition zones, dykes, fault zones and rock discontinuities on TBM performance 143 8.1 Introduction 143 8.2 Beykoz sewerage tunnel 143 8.3 Kartal-Kadikoy metro tunnels, methodology of understanding critical zones 153 8.4 Conclusions 163 References 165 9 Squeezing grounds and their effects on TBM performance 167 9.1 Introduction 167 9.2 Basic works carried out on squeezing ground 167 9.3 Uluabat tunnel 168 9.4 Kargi Tunnel 179 References 186 10 Clogging of the TBM cutterhead 189 10.1 Introduction 189 10.2 What is clogging of a TBM cutterhead and what are the clogging materials? 189 10.3 Testing clogging effects of the ground 189 10.4 Mitigation programs to eliminate clogging 191 10.5 Clogging of TBMs in Turkish projects 192 10.6 Conclusions 207 References 208 11 Effect of high strength rocks on TBM performance 211 11.1 Introduction 211 11.2 Beykoz sewerage tunnel, replacing CCS disc cutters with V-type disc cutters to overcome undesirable limits of penetration for a maximum limit of TBM thrust 211 11.3 Nurdagi tunnel, full-scale cutting tests to obtain optimum TBM design parameters in very high strength and abrasive rock formation 213 11.4 Beylerbeyi-Kucuksu wastewater tunnel, TBM performance in high strength rock formation 216 11.5 Tuzla-Akfirat wastewater tunnel, TBM performance in high strength rocks 221 11.6 Conclusions 222 References 223 12 Effect of high abrasivity on TBM performance 225 12.1 Introduction 225 12.2 Determination of the abrasivity 229 12.3 Empirical prediction methods for disc cutter consumption 232 12.4 Examples of cutter consumptions on TBMs in Turkey 239 12.5 Conclusions 269 References 271 13 Effect of methane and other gases on TBM performance 273 13.1 Properties of methane 273 13.2 Selimpasa wastewater tunnel, methane explosion in the pressure chamber of an EPB-TBM 275 13.3 Gas flaming in the Silvan irrigation tunnel 284 13.4 More gas-related accident examples for mechanized tunneling 287 13.5 Conclusions 290 References 291 14 Probe drilling ahead of TBMs in difficult ground conditions 293 14.1 Introduction 293 14.2 General information on probe drilling and previous experiences in different countries 293 14.3 Melen water tunnel excavated under the Bosphorus in Istanbul 295 14.4 Methodology of predicting weak zones ahead in the Melen water tunnel 297 14.5 Kargi energy tunnel 308 14.6 Conclusions 316 References 318 15 Application of umbrella arch in the Kargi project 321 15.1 Introduction 321 15.2 General concept of umbrella arch and worldwide application 321 15.3 Methodology of using umbrella arch in the Kargi project 322 15.4 Criteria used for umbrella arch in the Kargi project and the results 325 15.5 Conclusions 330 References 331 16 Index 333
זמן אספקה 21 ימי עסקים